LIKE CONTACT US HOME

Boulder Associates Architects

Case Studies

Case studies are an important means of conveying best practices and lessons learned, and provide information critical to those making efforts to raise the bar. We have gathered the following data on our most notable projects in an effort to assist facility owners, operators and project design teams across the nation in their decision-making processes, and to provide students with access to timely information.

A Second Chance to Serve:

Community Hospital’s new Peninsula Wellness Center is reaching out to heal both the land and the community, renewing the historic site’s role as a training ground for success.

more details
Photovoltaic Systems in Healthcare:

Healthcare projects can identify the true benefits of on-site renewable energy utilizing Practice Greenhealth’s Energy Impact Calculator.

more details
New Meadows Long Term Care Facility:

Designed to meet the 2030 challenge and improve the quality of life for residents, this facility is seeking LEED Silver certification

more details
Colorado State Veterans Center Homelake Domiciliary Renovation:

The renovation of 24 historical duplex cottages on the campus of the Colorado State Veterans Center at Homelake is a unique project, incorporating current building technologies and sustainability methods, while simultaneously restoring the historic characteristics of the original cottages.

more details
Day Family Health Center | People’s Clinic:

Salvaging components from a previous build-out and reducing on-going energy bills through the use of on-site renewable were key focuses for this 21,120 s.f. community health center project for Clinica Family Health Services.

more details
Sutter North Bay Regional Surgery Center:

Achieving LEED-CI Gold, North Bay Regional Surgery Center was the first Sutter Health Affiliate project to earn certification from the USGBC.

more details
Boulder Associates Sacramento Offices:

This adaptive reuse project was designed to support our growing Sacramento staff, and recently achieved LEED-CI Gold certification.

more details
On-site Renewables in Healthcare:

A comparison of two similarly sized installations with different technologies, financing, and ownership structure.

more details
Denver Health Pavilion for Women and Children:

This 107-bed facility is the first public safety-net hospital project to achieve LEED certification (LEED-NC Silver), funded by a voter-approved bond issue.

more details
Boulder Associates Boulder Offices:

This tenant improvement project was the first ever to receive LEED-CI v2 certification (LEED-CI Gold), and is our home base in Boulder.

more details
Boulder Community Foothills Hospital:

The first hospital in the nation to achieve LEED certification (LEED-NC Silver), this 60-bed acute care facility pioneered sustainable healthcare design.

more details